Dlw varanasi summer training report pdf
Long hood assembly Buffer assembly Radiator setting 4.
![dlw varanasi summer training report pdf dlw varanasi summer training report pdf](https://image.slidesharecdn.com/dlwreport-170425193447/95/dlw-varanasi-summer-training-report-31-638.jpg)
![dlw varanasi summer training report pdf dlw varanasi summer training report pdf](https://reader020.staticloud.net/reader020/html5/20190923/5a6513d67f8b9af3398b542b/bg4.png)
Drive cap assembly Air compressor assembly Control stand assembly 2. The complete locomotive is assembled in LAS.Shaping Facing operation Drilling operation Grinding operation Turning operation Lathe Machine Shaper Machine Drilling Machine Milling Machine Grinding Machine CNC Machine Marking tools: Scriber, Divider and Center Punch.Striking tools: Ball peen hammer, straight peen hammer, cross peen hammer.Cutting tools: Hacksaw, chisel and files.Measuring tools: Steel Rule, Inside Caliper, Outside Caliper, Vernier Caliper and Micro meter.WDP3A 3100 HP PASSENGER LOCOMOTIVE 1350 HP CAPE GAUGE LOCOMOTIVE HP CAPE GAUGE LOCOMOTIVE 2300 HP METER GAUGE LOCOMOTIVE 3000 HP CAPE GAUGE LOCOMOTIVEįitting shop Machine shop LAS (Loco Assembly Shop) HWS (Heavy Welding Shop) RS (Rotor Shop) TMS (Truck Machine Shop) Loco Assembly: In loco assembly shop all the electric equipment, engine, bogie and under frame are assembled.Here wheels and axle is made surface finish and then assemble the axle wheel and traction motor form bogie.Iron plate is cut by the plasma and laser cutting.The complete power pack with electrics are tested on computerized Engine Test Bed to verify prescribed horsepower output.Pre-inspected engine block, crankshaft, cylinder liners, pistons, connecting rods, cylinder heads, exhaust manifold, turbo supercharger and all related piping are used in assembly of engine.Over 2000 components are manufactured turbo superchargers, cam shafts, cylinder heads, cylinder liners, connecting rods and various gears.High precision angular boring bars on which different boring inserts are mounted.This perform milling, drilling, tapping and boring operations in single setting. Engine block machining is done on Portal Milling Machine which is a 5 axis CNC machine.Fabrication of Engine Block/ Crankcase:.Flame Cutting of Components: Steel plates of sizes up to 80 mm thickness are cut by numerically controlled flame cutting machines, Plasma Cutting Machine.Specialization of Work Culture at Diesel Locomotive Works (DLW) BLOCK DIVISION
Dlw varanasi summer training report pdf iso#
ĭiesel Locomotive Works (DLW) Certification ISO 9001 (International Organization for Organization) ISO 14001 OHAS 18001 (Occupational Health And Safety Zone).Diesel Locomotive Works (DLW) manufactures the diesel electric locomotive engine (EMD and ALCO) and DG sets.
![dlw varanasi summer training report pdf dlw varanasi summer training report pdf](https://image.slidesharecdn.com/summertrainingreport-shailesh-150523005811-lva1-app6892/95/summer-training-report-dlw-varanasi-10-638.jpg)